Sunday, 15 February 2009

Black 5 kit update




Just a few shots of work in progress on the first test build for those of you signed up the kits.
Most things on the etch (see previous posting) have worked fine but one or two didn't and have been redesigned to make things easier for the builder. Also now done are most of the casting masters for the various boiler fittings (but not yet the boilers themselves), although I've taken advantage of the second (hopefully the last) test etch, to include some more small items that will be incorporated in such things as the masters for the different types of top feed employed on these locos.

Bob.

No comments: